• Fri. Nov 22nd, 2024

Quantity Survey

  • Home
  • ENHANCING BARRACKS ACCOMMODATION IN NIGERIA ARMY THROUGH DIRECT LABOUR PROJECT

ENHANCING BARRACKS ACCOMMODATION IN NIGERIA ARMY THROUGH DIRECT LABOUR PROJECT

The aim of this study is to investigate ways of enhancing barrack accommodation in Nigeria army through direct labour project.

AN ASSESSMENT OF FACTORS INFLUENCING COST DIFFERENTIAL OF CONTRACT SUM OF BUILDING PROJECT

The research study on “An Assessment of Factors Influencing Cost Differential of Contract Sum of Building Project”, to achieve the aim of this research, the following objectives were established: To…

A STUDY ON THE ASSESSMENT ON THE APPROXIMATE ESTIMATE PERFORMANCE IN FORCASTING THE ACTUAL COST OF CONSTRUCTION PROJECTS IN NIGERIA

SOLD BY: Excellent Project| ATTRIBUTES: Title, Abstract, Chapter 1-5 and Appendices|FORMAT: Microsoft Word| PRICE: N5000| BUY NOW |DELIVERY TIME: Within 24hrs. For more details Chatt with us on WHATSAPP @…

INVESTIGATION INTO THE ADOPTION OF KNOWLEDGE MANAGEMENT (KM) IN THE NIGERIAN CONSTRUCTION INDUSTRY

The main Aim of this research is to investigate the Adoption of knowledge management in the Nigeria construction industry. The research examined the area of the construction industry that will…

COMPARATIVEANALYSIS OF LIFE CYCLE COSTING OF ALTERNATIVE ROOF COVERING MATERIALS IN RESIDENTIAL BUILDING CONSTRUCTION

The aim of this research is to analyzed and compare the life cycle cost of alternative root covering materials, Zink coat roofing sheet materials, corrugated Asbestos cement roofing materials, concrete…

COMPARATIVE ASSESSMENT OF FACTORS AFFECTING COST OF INDUSTRIALIZED BUILDING AND CONVENTIONAL BUILDING SYSTEM IN NIGERIA

The main aim of this research work is to compare the factors affecting cost of industrialized building and conventional building system in Nigeria. The research method used in collecting data…

ASSESSMENT OF TUE FACTORS MITIGATING THE EFFECTIVE PREPARATION OF COST ESTIMATE AT TILE DESIGN STAGE

This research is aimed at examining the factors affecting accuracy of pre-lender cost estimate in Abuja, with a view to improving the predictive ability of clients, consultants, and contractors for…

Verified by MonsterInsights